Back to systems
// Tube Wall · Twin-Torch Overlay

Twin Head Boiler Tube & Tube Wall Cladding System

High-productivity twin-torch overlay for boiler tube panels — parallel deposition, ±0.2 mm accuracy.

Twin Head Boiler Tube & Tube Wall Cladding System — primary view
Tube Wall · Twin-Torch Overlay
// Overview

System Summary

Purpose-built for boiler tube panels and waste-to-energy applications. Independent twin torches with dedicated wire feeders deposit in parallel across panel widths up to 3 m. Servo-controlled linear axes and water-cooled torches sustain duty cycles required by 3-shift overlay operations.

// Features
  • Independent twin torches
  • Dual wire feeders
  • Water-cooled torches
  • Servo-controlled linear axes
  • Panel-width gantry overlay
  • PLC + HMI control
// Specifications
Panel Width
Up to 3 m
Travel Speed
50 – 1,000 mm/min
Weld Speed
50 – 800 mm/min
Positioning Accuracy
±0.2 mm
Process
Hot Wire TIG / GMAW
// Applications
  • Waste-to-energy boiler tubes
  • Power plant tube panels
  • Tube wall overlay
// Industries
  • Waste to Energy
  • Power Generation
  • Heavy Engineering
// Advantages
  • Parallel deposition — significantly higher productivity
  • Low dilution overlay
  • Built for harsh-duty cycles
// Enquire

Request specs for
Tube Wall · Twin-Torch Overlay

Share your application requirements. Our engineering team will respond with a detailed configuration, layout drawings and indicative pricing.

We respond within 24 business hours.

// All Systems

Explore the full Weldmatix range